Jamb Unveils New Guidelines For 2017 Utme | Requirements To Start A Cbt Centre
THE GUIDELINES SHOULD ALSO BE FIRMLY HELD BY BOTH THE EXISTING AND INTENDING CBT CENTRE OWNERS .
1) MINIMUM 15 INCHES FLAT SCREEN COMPUTER MONITOR FOR DESKTOP OR 17
INCHES FOR LAPTOP.
2) THE COMPUTER SYSTEMS MUST BE CONNECTED TO A ROBUST COMPUTER SERVER WITH A CAPACITY TO CARRY 250 SYSTEMS CONCURRENTLY.
3) ALL THE COMPUTER SYSTEMS MUST BE LINKED TOGETHER ON CABLE LOCAL AREA NETWORK TOPOLOGY ( LAN ) . ( WIRELESS COMPUTER CONNECTION IS NOT
ALLOWED ) .
4) ADEQUATE SECURITY AND MINIMUM OF FIVE ( 5) TECHNICAL PERSONNEL AND ONE NETWORK ENGINEER AVAILABILITY OF BACK -UP POWER SUPPLY ( POWER GENERATING SET OF MINIMUM 40KVA FOR A CENTRE WITH 250 SYSTEMS; 60 KVA FOR 350 SYSTEMS AND 100KVA FOR ABOVE 350 SYSTEMS) AND UPS / INVERTERS
THAT CAN CARRY ALL SYSTEMS FOR A MINIMUM OF TWO ( 2) HOURS.
5) — THE CENTRE MUST BE ADEQUATELY FENCED . PROVISION MUST BE MADE FOR A HOLDING ROOM OR RECEPTION FACILITY E.G CANOPY WITH CHAIRS , ETC .
6) — THE CENTRE MUST NOT BE IN SHARED PREMISES SUCH AS CINEMA HALL,
SHOPPING MALL , MARKET , ETC .
7) —AVAILABILITY OF ADEQUATE AND FUNCTIONAL AIR - CONDITIONERS AND
LIGHTING.
8) PROVISION OF UP TO DATE ANTIVIRUS AND ALL THE SYSTEMS MUST BE VIRUS
FREE.
9) MINIMUM OF WINDOWS 7 OR HIGHER VERSION OF WINDOWS OPERATING
SYSTEM .
10) IP CAMERA ( CCTV) IS COMPULSORY FOR ALL CBT CENTERS ( SPECIFICATION TO BE GIVEN BY JAMB ) .


0 comments:
Post a Comment